Knowledge Mobilization in Global Projects and Organizations
- Sanei, M., Javernick-Will, A., and Chinowsky, P. (2013). Construction Management and Economics. 31 (9), 991-1004. doi: 10.1080/01446193.2013.835490
- Senesi, C., Javernick-Will, A., Molenaar, K. (2013). Construction Industry Institute. Austin, TX.
- Wanberg, J. and Javernick-Will, A., Taylor, J., and Chinowsky, P. (2013). Engineering Project Organization Conference. Granby, CO.
- Berteaux, F., Javernick-Will, A., and Chi, C. (2013). Engineering Project Organization Conference, Granby, CO.
- Berteaux, F. (2013). Thesis, Â鶹Ãâ·Ñ°æÏÂÔØ.
- Javernick-Will, A. (2013). Engineering Management Journal. 25 (3), 16-26. doi: 10.1080/10429247.2013.11431979
- Alsamadani, R. , Hallowell, M., Javernick-Will, A., and Cabello, J. (2013). Journal of Construction Engineering and Management. 139 (9), 1125-1134. doi: 10.1061/(ASCE)CO.1943-7862.0000724
- A two-sided, laminated reference sheet explaining the appropriate uses and interpretations of three levels of project risk analysis. Includes descriptive samples of probabilistic risk analysis outputs, e.g., heat maps and tornado charts.Senesi, C.,
- Senesi, C., Javernick-Will, A., and Molenaar, K., Furlani, K. and Relyea, C. (2012). Construction Industry Institute. Austin, TX.
- Senesi, C., Javernick-Will, A., and Molenaar, K., Furlani, K. and Relyea, C. (2013). Construction Industry Institute. Austin, TX.