UMC HVAC Project

A major construction project is planned for the UMC in spring and summer 2026. Stay tuned and check back for pre-construction details and ongoing updates. You’ll also find available amenities and navigation assistance around the construction site when the project begins.Ìý

Ìý
Timeline

Preparations and communication will start in September 2025.Ìý

Construction at UMC will occur from January to July 2026.Ìý

Construction workÌýÌý

Upcoming construction will improve the HVAC system, Campus Dining Services loading dock and pavement between the UMC and CASE buildings. This includes:Ìý

  • Replacing outdated HVAC equipment in UMC dining areas.
  • Connecting new units to the campus chilled water system.
  • Removing a non-functioning cooling tower.
  • Expanding the dock for improved efficiency, safety and traffic flow.Ìý

Enhancements also include:Ìý

  • Installing an infrared snow-melt system for improved safety at the Book Store dock ramp.
  • Replacing an aging kitchen utility distribution panel to prevent costly emergency repairs.
  • Converting the west dining area to energy-efficient LED lighting.ÌýÌý

These updates aim to modernize a portion of the UMC facilities, improve safety and enhance overall functionality.Ìý ÌýÌý

Ìý
Amenities during constructionÌý


The following locations will be open during construction:Ìý

Dining: The ConnectionÌýÌý

Student services and spaces:ÌýÌý

  • Alienware Buffalo Esports and Gaming Lounge
  • Basic Needs Center
  • Buff Pantry
  • Center for Student Involvement
  • Commuter Lounge
  • Â鶹Ãâ·Ñ°æÏÂÔØBook Store
  • Â鶹Ãâ·Ñ°æÏÂÔØCollegiate Recovery Community
  • Â鶹Ãâ·Ñ°æÏÂÔØEvents Planning & Catering
  • Â鶹Ãâ·Ñ°æÏÂÔØNightRide
  • Â鶹Ãâ·Ñ°æÏÂÔØStudent Government
  • Dennis Small Cultural Center
  • Elevations Credit Union
  • Environmental Center
  • Fraternity and Sorority Life
  • Glenn Miller Ballroom
  • Ink Spot
  • KVÂ鶹Ãâ·Ñ°æÏÂÔØRadio 1190
  • Off-Campus Housing & Neighborhood Relations
  • Peace Corps
  • Program Council
  • Reflection Room
  • SECA Lounge
  • Student Legal Services
  • The Connection (food will be available)
  • Volunteer Resource Center
  • Standard reservable event spaces (Glenn Miller Ballroom, Aspen Rooms, 235 multipurpose room, etc.)
  • Meeting and study spaces around the UMCÌý

The following locations will be closed during construction (January-July 2026):

Dining:Ìý
  • Alferd Packer Grill
  • Infinitus Pie
  • Panda Express
  • Subway
  • Starbucks
  • UMC Market
Spaces:
  • Temporary venues for student activities and meetings
  • Dining room seating spaceÌý

Directional signage and navigationÌýÌý

  • There will be on-site signage for clearly marked pathways and safety zones.
  • The digital campus map is available also.
  • We will continuously assess and improve signage to enhance navigation.Ìý

How to stay informedÌýÌý

  • This webpage will be updated weekly with progress, milestones and impact notices.
  • Regular construction updates will be shared in the Â鶹Ãâ·Ñ°æÏÂÔØBoulder Today newsletter.
  • Follow us on and for real-time updates.
  • Real-time emergency notifications and alerts will be shared if there are any sudden changes or safety concerns.Ìý

Contact usÌý

For inquiries or concerns, please reach out via:Ìý

Ìý
Email
umc-admin@colorado.edu

Ìý
Phone
303-492-8832

Ìý
Office hours
Visit UMC 305, Monday – Friday from 8 a.m. to 4:30 p.m.ÌýÌý


Thank you for your patience and cooperation as we work to create a new and improved University Memorial Center for our campus community!Ìý